Featured Projects
Search and sort projects with your choice of search options including types of venues, regions, and keyword search text below.

NW Natural Headquarters Corporate Headquarters
ABD Engineering & Design worked with GBD Architects on the new NW Natural headquarters. Staff were accustomed to a combination of small open office areas, traditional cubicles, and closed offices.…

Cleveland Clinic Florida Weston Hospital
ABD Engineering & Design worked with Skidmore, Owings & Merrill (SOM) on the expansion of the Cleveland Clinic Florida campus. The project included significant expansion of the Emergency Department and…

Winston Churchill High School Performing Arts Center Auditorium
ABD Engineering & Design worked with French Associates, Inc. on a complete renovation of the existing auditorium. Our work on the project included room acoustics to properly deliver sound from…

La Porte High School Performing Arts Center
ABD Engineering & Design worked with Schmidt Architects on complete acoustical consulting and audiovisual design for this auditorium and support spaces renovation project. Rotating an existing auditorium 90 degrees to…

Kaiser Permanente Sunnyside Medical Center Hybrid OR and CVL
Selecting and verifying locations for a hybrid operating room (hybrid OR) and a central venous line (CVL) procedure room requires specialized vibration analysis and mechanical noise and vibration control. ABD…

TriMet Warning Bells Light Rail Pedestrian Crossings
Beginning with measurements taken in 2015, ABD Engineering & Design worked with TriMet to conduct sound measurements of warning bells at MAX Light Rail pedestrian crossings. When it was discovered…

Tacoma General Hospital MRI Suite Renovation and Expansion
ABD Engineering & Design worked with Clark Kjos Architects to conduct an MRI vibration study at the Tacoma General Hospital Multicare Regional Cancer Center. Our Professional Engineer and vibration expert…

The Foundry Adaptive Re-use Office Space
This adaptive re-use by Eckert Wordell took a historic iron foundry and steel fabrication facility and re-purposed it as "Kalamazoo’s first Living Office® workspace designed to help you reimagine how…

Woodburn High School Band and Chorus Rooms
ABD Engineering & Design worked with BBL Architects to develop room acoustics and noise isolation recommendations for the Woodburn High School performing arts classrooms. Band and chorus rooms are often…