Completed | 2018 | Healthcare | Project
ABD Engineering & Design worked with Skidmore, Owings & Merrill (SOM) on the expansion of the Cleveland Clinic Florida campus. The project included significant expansion of the Emergency Department and Intensive Care Unit (EDICU), and the addition of a 74 bed...
Completed | August, 2019 | Healthcare | Project
ABD Engineering & Design worked with ZGF Architects to provide complete acoustical consulting services for building 2 in the OHSU Center for Health and Healing complex. Building 2 is composed of two structures, a 450,000 SF 15-story hospital, and the Rood Pavilion, an...
Completed | June, 2019 | Healthcare | Project
Bettisworth North Architects hired ABD Engineering & Design for complete acoustical engineering services for the Yukon-Kuskokwim Health (YKHC) Dr. Paul John Calricaraq Center. The Paul John Calricaraq Project (PJCP) took input from local tribal leaders and residents...
Completed | September, 2018 | Healthcare | Project
Selecting and verifying locations for a hybrid operating room (hybrid OR) and a central venous line (CVL) procedure room requires specialized vibration analysis and mechanical noise and vibration control. ABD Engineering & Design worked closely with PKA Architects...
Completed | March, 2018 | Healthcare | Project
ABD Engineering & Design worked with Clark Kjos Architects to conduct an MRI vibration study at the Tacoma General Hospital Multicare Regional Cancer Center. Our Professional Engineer and vibration expert conducted a vibration study for the the renovation and...