Completed | September, 2024 | Museum | Project
Scott Edwards Architecture, the Chehalem Park and Recreation District (CPRD), and Chehalem Cultural Center (a nonprofit 501(c)(3) organization) brought ABD Engineering & Design in for this adaptive reuse project. The ongoing project reimagined a 1935 WPA elementary...
Completed | December, 2021 | Auditorium | Project
ABD Engineering & Design worked with Thendesign Architecture on complete acoustical consulting for this new high school performing arts center. ABD’s acoustical engineering services for the Fremont Ross High School Performing Arts Center included room acoustics, noise...
Completed | July, 2023 | Auditorium | Project
ABD Engineering & Design worked with Schmidt Associates to provide acoustical engineering and audiovisual design services for renovating the existing 1200 seat auditorium and 480 seat theater. ABD’s acoustical engineers performed acoustical testing in the existing...
Completed | November, 2018 | Auditorium | Project
ABD Engineering & Design worked with French Associates, Inc. on a complete renovation of the existing auditorium. Our work on the project included room acoustics to properly deliver sound from the stage to all seating areas, noise isolation from adjacent spaces, and...
Completed | September, 2017 | Higher Education | Project
ABD Engineering & Design worked with Stantec (Philadelphia) on the Hope College Jim and Martie Bultman Student Center, the college’s first dedicated student-center space since 1980. The facility includes a comfortable lounge with fireplaces and a view across the Pine...