Completed | September, 2020 | Performance | Project
ABD Engineering & Design was hired by a national engineering firm to assist with the expansion and improvement of their existing video studio in Eastern Washington State. The studio, in the basement of a 5-story office building, presented a number of acoustical...
Completed | November, 2019 | Workplace | Project
Warner Norcross + Judd occupies the 15th floor of the Warner Building (a 15-story mixed-use tower) in the heart of Grand Rapids, along with other locations throughout Michigan, including Detroit, Grand Rapids, and Kalamazoo. The attorney's offices, conference rooms,...
Consumers Energy
Corporate Headquarters and Historic Post Office Renovation
Completed | 2001 | Workplace | Project
ABD Engineering & Design worked with Neumann/Smith Architecture, FTC&H Engineers, and Granger Construction on the historic renovation and adaptive re-use as well as the new construction alongside this beautiful, award-winning project. The 12-story high-rise corporate...
The Foundry
Adaptive Re-use Office Space
Completed | May, 2018 | Conference Center | Project
This adaptive re-use by Eckert Wordell took a historic iron foundry and steel fabrication facility and re-purposed it as "Kalamazoo’s first Living Office® workspace designed to help you reimagine how — and where — you work, create and thrive." ABD provided complete...
Completed | 2016 | Office | Project
ABD Engineering and Design worked with Eppstein Uhen Architects to design complete Acoustical Consulting, along with Audio-Video and Conference Room Technology for the Acuity Insurance corporate headquarters. Our Professional Engineers developed room acoustics, noise...